Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Selection of material and BOM.

...

Field

Function

Material

The material number which is the entry object for the BOM explosion and dynamic baseline report.

Plant

Plant number for BOM explosion.

Alternative

Alternative BOM for BOM explosion.

Explosion level

Defines the maximum explosion levels for an explosion of a multi level BOM. The number defines the maximum level to be exploded. Entry material has level 0.

Required qty

Required quantity sets the reference for the component quantity. If no required quantity is defined, the component quantities will be according to the BOM positions.

Info

This selection option should be used together with the corresponding fields in the field selection (component quantity), see Tab "Field Selection".

By BOM usage

Sets BOM usage for BOM explosion.

By application

Sets BOM application for BOM explosion.

Flat, sorted, reduced list

If this option is set, the output of the BOM explosion will be as follows:

  • No structure information (level, position number, quantities).

  • Sorted by material number.

  • Only one output for multiple used components.