Available functions on the initial screen:
Function | Description | |
---|---|---|
Mass operation / Continue (F8) | Start: Objects are checked and collected, then the main dialogue will be displayed. | |
Display / Exit (Ctrl+F5) | Allows locking / activating a clone operation for another usage (end operation). See Lock Clone Operation. | |
Display / Clone job log (F7) | Transaction to display and delete the clone job log. |
...
Input Fields on the Initial Screen
Depending on the definition only some input fields will be available.
Field (-section) | Description |
---|---|
Mass operation | Selection of the mass operation. |
BOM entry | Input of BOM for the mass operation. |
Document structure entry | Definition of the document structure for this mass operation. |
Option for object selection | Selection of options for a mass operation of a BOM or document structure. |
New object selection | If activated, the objects for the operation can be defined by a new selection. See Object Selection |
Use saved object selection | If activated, the objects are determined by a stored selection. The selection must always be selected. See Object Selection |
PCF selection | Only available if ProPLMClient is installed on the system. The objects will be loaded from a stored selection. |
Build selection using a file | If activated, the key for the objects to handle are read from a file. |
Edit | Edit saved object selections. See Edit a Selection. |
Max. Version | For object selection by documents. If activated, always the maximum version of selected documents are used. Also if stored selections are used. |
Validity | Validity for the explosion of the BOM or the document structure. |
Selection changes to process | Depending on the settings only objects will be edited in the operations of a check or release process, which are currently in change with this change number. For multiple change numbers a pattern can be used for the change numbers, "*" is used for one or multiple character "+" for exactly one character. |
Start change with | For operations which start a change and clone process. The change number valid for this change must be entered here. |
Start process: the structures are read, the objects checked and displayed on the ProMassOperations interface. See also next topic. |
...