Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  • Relationship 1 exists

  • Relationship 2 is created, node A is added but marked with Stop (maintenance of structure A in relationship 1)

  • When you create relationship 3, the system informs you that structure B is part of relationship 2 and if driving continues, this part is removed there and a stop mark is set

Set stop manually

Panel
panelIconIded6e3595-4ad8-442c-b440-6a82cde6704f
panelIcon:Locked:
panelIconText:Locked:
bgColor#FFBDAD

This function is protected by SMC Authorization.

Using the context menu function "Stop" or "Cancel stop", the stop mark can be set or removed from an assembly. When you set the stop mark, all underlying items are removed from the target structure. The stop mark can only be removed if the corresponding assembly is not contained in any other active structure relationship with the same validity.

Info

Depending on the settings applied to a position, stop will always be set and can’t be changed manually. In this case, the functions "Stop" and "Cancel stop" will not be available.