Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Definition of objects which shall be cloned, copied, exchanged or removed from the new structure.

See also Version Handling in Document StructursStructures for more information about document versions when cloning.

...

Element

Description

Mass operation

Display of the mass operation selected on the initial screen.

Object

Display of the object key in a tree structure. Structure represents the selected BOM document structure eventually with additionally assigned objects (e.g. documents to a material). The display of additional objects depends on the customizing setting.

Clone

The selected object will be cloned. Material or document will be copied, using the initial object, a new BOM is created. The BOM is created according the selection of the superior items.
If the superior position is also cloned, the new created object is used in the new BOM.
See also Clone.

Image Modified

Object cannot be cloned. Details are written in a separate message column.

Copy

If the superior object is cloned, the superior position will be copied identically into the new BOM.
If reference and target plant are different and the material has not been maintained in the target plant (missing material view) the missing view will be cloned from the material view of the reference plant. It will be indicated in the dialogue.

Image Modified

Replace

The relevant component will be replaced by another, already existing component. The new component must be registered in a dialogue.

Image Modified

The new material for the relevant plant must be maintained in the BOM.

If the target plant is not matching the reference plant and a material is without target plant view, it is checked whether the missing view can be cloned from the reference plant. If possible, the user is warned and asked for confirmation. Then the plant view will be created when processed.

For option "Clone replacement object", the material will not be integrated in the target structure, but its clone. If the replacement material / document has a structure, the components can be selected in a dialogue.

If the object with BOM is replaced by an object without suitable BOM, the user is warned and can select between two options:

Image Modified

Which BOM is used as reference depends in the current available data.

If the reference plant is different from the target plant and the replacement object has a BOM in the reference plant, it will be copied.

Else the BOM of the reference material will be copied from the reference plant.

If a new BOM is created for a replacement material and the BOM will be created with a change number, the currently used change number of the replacement material will be used and not the change number of the clone job. Else the validity of the material and the BOM may be different.
If an object without BOM is replaced by an object with BOM, the user is warned.

Image Modified

If a variable-size item should be replaced, some consistency checks will be processed for the new to be added material. They are similar to the ones processed in the BOM maintenance for variable-size items. They contain, among others, checks concerning the dimensions of UoM of the new material according the corresponding formula key maintained in the old material position.

Example: A material has to be enabled to be calculated in areal or cubic UoM, if such a formula key is provided (m -> m2 / m -> m3).

If this is not possible, a error message will be displayed and the new material can't be used to replace the old one.

Image Modified

In a dialogue the type of replacement is indicated by suitable icon next to the check box. See also General Interface Functions.

Ignor.

If the superior object is cloned, this position will be ignored in the new BOM.

New object

New number or ID for object which will be cloned. Possible is either an existing material or document number (continue clone process) per internal number to identify.

Current status

Current object status.

New status

Status of new cloned objects. See also Operation cloning.

New description

Only material clone operations in combination with ProConfiguration. Processing scenario for the creation of the material in the clone process. See also .

Description

Object description

Message

Additional information (see also above Clone).

Additional fields

Depending on the operation and objects additional columns with information will be displayed.