/
ProProcess V5.3.3

ProProcess V5.3.3

ProProcess Release Notes Version V5.3.3 / Release Date 6. März 2025

Fixed bugs

Key Summary Description
BPF-882 Calculations of deadlines with factory calendars not working When defining a factory calendar on either process level or part process level, this factory calendar is not taken into account when calculating the deadlines. This has been corrected.
BPF-883 Restricted values for "Report Task" parameters The possible values for the parameters in the report task are restricted. This has been corrected.
BPF-888 Subprocess element not cancelled if started process is canelled If a synchronous sub process is cancelled (either administrative or via process flow) the status is not correctly synchronized to the corresponding sub process element in the main process. this has been corrected.
BPF-889 Runtime error ASSERTION_FAILED in /PCH/CL_BPF_START_ENGINE->ADD_START_PROCESS_INT when starting sub process from simulated process If a sub process is started from a simulated process, the runtime error ASSERTION_FAILED occurrs in class /PCH/CL_BPF_START_ENGINE method ADD_START_PROCESS_INT. This has been corrected.
BPF-890 Runtime Error GETWA_NOT_ASSIGNED in /PCH/CL_BPF_CUST_WF_GEN_V02->PREPARE during activation of process When activating a process containing a sub process, the runtime error GETWA_NOT_ASSIGNED can occurr in the class /PCH/CL_BPF_CUST_WF_GEN_V02 Method PREPARE. This has been corrected.
BPF-893 Process Designer: Improved robustness regarding old inconsistent data in object list assignment The robustness regarding old inconsistent data in the object list assignment has been improved in the Process Designer.
BPF-894 Status of main object possibly not set If the status change is processed online after a user action and the same status is set repeatedly within the same session (e.g. in a repeat loop), it is possible, that one of the follow-on status changes are not executed. This has been corrected.

Related content

© ProNovia AG | Imprint | Data Protection