ProConfiguration V8.4.3
ProConfiguration new version V8.4.3 in development
Fixed bugs
Key | Summary | Description |
---|---|---|
CFM-335 | Logistics integration determination of plant revision with incorrect validity | When determining the documents in subordinate levels, the valid-from date of the plant revision for the top-level assembly (material to be produced / material to be delivered /...) is incorrectly used to determine the change / plant revision to be used. This can lead to incorrect documents / document versions. This has been corrected, the date according to the logistical object is now used correctly. |
CFM-336 | If components occur more than once in Logistics Integration, no documents may be transferred | If the same components are found multiple times in the CFM Logistics Integration, it can happen that no documents are transferred, depending on the data constellation. This has been corrected. |
CFM-337 | Long runtimes with many material assignments to a plan | If a large number of material masters are assigned to a plan (several thousand), this results in slower runtimes and possibly a termination with dump due to maximum runtime exceeded. This has been further improved. |
© ProNovia AG | Imprint | Data Protection