If changes to the structure relationship that have not yet been saved exist, the system asks whether you want to save them.
Change
In ProStructure, Change only refers to the maintenance of the header data of the structure relationship. Maintenance of the target structure of a changing structure relationship is dealt with in Editing the Target Structure
...
You can change the name and authorization group for both types at any time.
For comparative structure relationships, you can change the type to "Reconciliation and actions on target structure". When you save, the same checks are made as described under Creation of a Structure Relation.
For comparative structure relationships, you can change the validity of the reference and the target.
Deactivate/activate relationship
Only available on changing structure relationships. Deactivating a structure relationship sets it as terminated, i.e. the Status of a structure relation changes to "Structure relationship terminated, no further synchronization". If a structure relationship has this status, it is no longer included in the checks:
...
It is possible to reactivate a structure relationship. However, only if the corresponding target structure with the set validity is not in process in another active structure relationship. When you activate a deactivated structure relationship, it is set back to the status before deactivation.
Reset target validity
Note |
---|
This function is protected by SMC Authorization. |
Only available on changing structure relationships. If the selected target validity is wrong, it is possible to reset it. This may be necessary, for example, if the validity (directly / by change number) leads to errors in the substructures during application. The next time changes are applied to the SAP structures, the effectivity or change number to be used is queried again.
Deletion
Structure relationships can be deleted using the corresponding function and after confirmation.
...