Selection of material and BOM.
Field | Function |
---|---|
Material | The material number which is the entry object for the BOM explosion and dynamic baseline report. |
Plant | Plant number for BOM explosion. |
Alternative | Alternative BOM for BOM explosion. |
Explosion level | Defines the maximum explosion levels for an explosion of a multi level BOM. The number defines the maximum level to be exploded. Entry material has level 0. |
Required qty | Required quantity sets the reference for the component quantity. If no required quantity is defined, the component quantities will be according to the BOM positions. This selection option should be used together with the corresponding fields in the field selection (component quantity), see Tab "Field Selection". |
By BOM usage | Sets BOM usage for BOM explosion. |
By application | Sets BOM application for BOM explosion. |
Flat, sorted, reduced list | If this option is set, the output of the BOM explosion will be as follows:
|