Functions:
Available functions on the initial screen:
Function |
|
Description |
---|---|---|
|
Mass operation / Continue (F8) |
Start: Objects are checked and collected, then the main dialogue will be displayed. |
|
Display / Exit (Ctrl+F5) |
Allows locking / activating a clone operation for another usage (end operation) See Block Clone Operations |
|
Display / Clone job log (F7) |
Transaction to display and delete the clone job log. |
Example Screens for Mass Operations
Via Document Selection
|
Via BOM
|
Via Document Structure
|
Input Fields on the Initial Screen
Depending on the definition only some input fields will be available.
Field (-section) |
Description |
---|---|
Mass operation |
Selection of the mass operation. |
BOM entry |
Input of BOM for the mass operation. |
Document structure entry |
Definition of the document structure for this mass operation. |
Option for object selection |
Selection of options for a mass operation of a BOM or document structure. |
New object selection |
If activated, the objects for the operation can be defined by a new selection. See Object Selection |
Use saved object selection |
If activated, the objects are determined by a stored selection. The selection must always be selected. |
PCF selection |
Only available if ProPLMClient is installed on the system. The objects will be loaded from a stored selection. |
Build selection using a file |
If activated, the key for the objects to handle are read from a file. See Selection by File. |
Edit |
Edit saved object selections. See Edit a Selection |
Max. Version |
For object selection by documents. If activated, always the maximum version of selected documents are used. Also if stored selections are used. |
Validity |
Validity for the explosion of the BOM or the document structure. |
Selection changes to process |
Depending on the settings only objects will be edited in the operations of a check or release process, which are currently in change with this change number. |
Start change with |
For operations which start a change and clone process. The change number valid for this change must be entered here. |
|
Start process: the structures are read, the objects checked and displayed on the ProMassOperations interface. See also next topic. |