Existing dates are visualized with an icon and are available on the following objects:
process
prat process
activity
As soon as the mouse pointer is over the icons, all events are displayed. If these can be edited, the Edit function is available.
During modeling, dates must always be defined with a reference time and a duration including unit. These are then interpreted when the corresponding object is created and converted into an absolute date and time.
When editing dates, it is possible to change this automatic calculation by changing the reference time, the duration and/or the unit of duration. However, it is also possible to maintain a fixed date and time. You can switch between relative and absolute dates in the Rel. or Abs. column.