Initial Screen
Available functions on the initial screen:
Function | Description | |
---|---|---|
| Mass operation / Continue (F8) | Start: Objects are checked and collected, then the main dialogue will be displayed. |
| Display / Exit (Ctrl+F5) | Allows locking / activating a clone operation for another usage (end operation). |
| Display / Clone job log (F7) | Transaction to display and delete the clone job log. |
Example Screens for Mass Operations
Via Document Selection
Via BOM
Via Document Structure
Input Fields on the Initial Screen
Depending on the definition only some input fields will be available.
Field (-section) | Description |
---|---|
Mass operation | Selection of the mass operation. |
BOM entry | Input of BOM for the mass operation. |
Document structure entry | Definition of the document structure for this mass operation. |
Option for object selection | Selection of options for a mass operation of a BOM or document structure. |
New object selection | If activated, the objects for the operation can be defined by a new selection. See Object Selection. |
Use saved object selection | If activated, the objects are determined by a stored selection. The selection must always be selected. See Object Selection. |
PCF selection | Only available if ProPLMClient is installed on the system. The objects will be loaded from a stored selection. |
Build selection using a file | If activated, the key for the objects to handle are read from a file. |
Edit | Edit saved object selections. See Edit a Selection. |
Max. Version | For object selection by documents. If activated, always the maximum version of selected documents are used. Also if stored selections are used. |
Validity | Validity for the explosion of the BOM or the document structure. |
Selection changes to process | Depending on the settings only objects will be edited in the operations of a check or release process, which are currently in change with this change number. For multiple change numbers a pattern can be used for the change numbers, "*" is used for one or multiple character "+" for exactly one character. |
Start change with | For operations which start a change and clone process. The change number valid for this change must be entered here. |
| Start process: the structures are read, the objects checked and displayed on the ProMassOperations interface. See also next topic. |
© ProNovia AG | Imprint | Data Protection