Replace MUD
With mass operation Replace MUD a MUD can be replaced in all its usages by another MUD.
The following steps are required:
Call function Replace MUD.
Enter the respective MUD which should be replaced.
Enter the new MUD which will be the replacement in the configuration.
If more than one control group is available, one must be selected.
Execute will start searching the usages of the MUD, which must be replaced.
The material master records will be checked. If all can be used for this function, the action will be directly registered, else the material master will be displayed with additional information. Afterwards the registration will be stopped or the registration takes place for all material masters possible.
Then the monitor for the current action will be called and all interface functions as described in Monitor Interface and Selection Screen of the MUD Monitor will be available.
© ProNovia AG | Imprint | Data Protection